CLC process map of Building Control Approval for Higher-Risk Building Works
The Construction Leadership Council (CLC) meets with the Building Safety Regulator (BSR), on a weekly basis to address priority areas and maximise communication to the industry on building control approval for higher-risk building (HRB) work.
The work has included establishing a new task and finish group to consider the journey of a new project through the building control process for both the Regulator and industry to support the submission, assessment and timely approval of high quality and compliant building control applications for new HRBs. Ther CLC have noted that:
"As part of this work the CLC intends to provide information and thereby greater clarity to applicants to help achieve successful projects and occupied buildings."
"Initial outputs include the publication of a summary process map of the current building control application process for a new HRB."
"This document brings together for the first time a clear summary of the whole process from planning gateway one to gateway 3 and will evolve as required."
- Understand the whole building control application process – do not approach from just completing one single gateway stage at a time.
- Prepare for gateway 3 from the start – the documents relied upon for gateway 3 evolve through the whole building control application process.
- Provide clear and comprehensive applications – demonstrate compliance with the functional requirements of the Building Regulations – not just what, but the why and how compliance will be achieved.
- Ensure a high quality application – this includes both the plans and documents, and they are not an independent set of documents. Provide sufficient technical detail and cut down on superfluous information such as repeated extracts of the legislation.
- Submit complete applications – check you have followed the application requirements and have submitted the full list of documents for validation.
"Over the coming weeks it is intended that more detailed information and advisory notes on specific elements of the process will be published. This will build on and compliment informative and helpful guidance by other stakeholder groups including Build UK."
This article appears on the CIC news and websites as 'Building Control Approval for Higher-Risk Building Work' dated 24 March, 2025. For more information about the work of the CIC visit https://www.constructionleadershipcouncil.co.uk/.
[edit] Related articles on Designing Buildings
- ACM cladding.
- Building Safety Act.
- Grenfell Tower articles.
- Grenfell Tower Fire.
- Hackitt review.
- High rise building.
- Higher risk buildings.
- Higher risk residential buildings.
- Roof terraces and higher-risk buildings.
- The Higher-Risk Buildings (Description and Supplementary Provisions) Regulations 2023.
- The Higher-Risk Buildings (Key Building Information etc.) (England) Regulations 2023.
- The Higher-Risk Buildings (Management of Safety Risks etc) (England) Regulations 2023.
Featured articles and news
Embedding AI tools into architectural education
Beyond the render: LMU share how student led research is shaping the future of visualisation workflows.
Why document control still fails UK construction projects
A Chartered Quantity Surveyor explains what needs to change and how.
New planning reforms and Warm Homes Bill
Take centre stage at UK Construction Week London.
A brief run down of changes intentions from April in an onwards.
Reslating an ancient water mill
A rare opportunity to record, study and repair early vernacular roofs.
CIOB Apprentice of the Year 2025/26
Construction apprentice from Lincoln Mia Owen wins this years title.
Insulation solutions with less waste for a circular economy
Rob Firman, Technical and Specification Manager, Polyfoam XPS explains.
Recycled waste plastic in construction
Hierarchy, prevention to disposal, plastic types and approaches.
UK Net Zero Carbon Buildings Standard V1 published
Free-to-access technical standard to enable robust proof of a decarbonising built environment.
Prostate Cancer Awareness Month
Why talking about prostate cancer matters in construction.
The Architectural Technology podcast: Where it's AT
Catch up for free, subscribe and share with your network.
The Association of Consultant Architects recap
A reintroduction and recap of ACA President; Patrick Inglis' Autumn update.
The Home Energy Model and its wrappers
From SAP to HEM, EPC for MEES and FHS assessment wrappers.
Future Homes Standard Essentials launched
Future Homes Hub launches new campaign to help sector prepare for the implementation of new building standards.
Building Safety recap February, 2026
Our regular run-down of key building safety related events of the month.
Planning reform: draft NPPF and industry responses.
Last chance to comment on proposed changes to the NPPF.
A Regency palace of colour and sensation. Book review.























